Note
|
The Grid Community Toolkit documentation was taken from the Globus Toolkit 6.0 documentation. As a result, there may be inaccuracies and outdated information. Please report any problems to the Grid Community Forums as GitHub issues. |
GCT → GRAM 5
The Grid Resource Allocation and Management (GRAM5) component is used to locate, submit, monitor, and cancel jobs on Grid computing resources. GRAM5 is not a Local Resource Manager, but rather a set of services and clients for communicating with a range of different batch/cluster job schedulers using a common protocol. GRAM5 is meant to address a range of jobs where reliable operation, stateful monitoring, credential management, and file staging are important.
The following guides are available for this component:
For important general concepts about job management in GCT. Includes GRAM5 Approach. |
|
For system administrators and those installing, building and deploying GCT. You should already have read the Installation Guide and Quickstart |
|
Describes how end-users typically interact with this component |
|
Reference and usage scenarios for developers. |
|
Other information available for this component are: |
|
What’s new with the 6.2 release for this component |
|
Information for all public interfaces (including APIs, commands, protocols, etc). Please note this is a subset of information in the Developer’s Guide |
|
Information about test coverage reports, etc. |
|
Information for migrating to this version if you were using a previous version of GT or GCT. |